BESS Size:
22.4 MWh
Type:
Standalone BESS
Location:
Houston, TX
COD:
2025
Utility:
CenterPoint
Off-taker:
Merchant
This project marks the first distributed generation BESS interconnected to CenterPoint Energy’s distribution system and participating in Electric Reliability Council of Texas (ERCOT)’s wholesale delivery market.
Agilitas Energy will leverage its expertise in energy storage to operate the BESS to provide essential services to ERCOT. The newly operational BESS will strengthen grid resiliency during peak events and will lower electric system costs by participating in the ERCOT energy and ancillary services markets.
By providing diverse and reliable energy reserves, the BESS supports ERCOT’s efforts to maintain a stable and resilient power grid and provide options to the peaker and fossil-fuel-based plants that grid operators traditionally call upon during peak demand periods.
401 Edgewater Place, Suite 570, Wakefield, MA 01880